Visitor No.3013968 ..   
TrustPassKenplas Industry Ltd.Discussion Forum
 
Kenplas Forum ==> Injection Molding (Machine) ==> relation wall thickness and hold condition
<< Previous Topic
1
For husky/Kraussmaffie type m/c where there is a robo cooling the hold time will be 1.5t (where t is the wall thickness of the preform.)and cooling time will be t2/4 (square of t) and in case of without robo cooling it will be t2.Chiller temp. has also a greater role to play.
Cushion is also an important parameter for effective holding and melt residence time which should be in range of 15mm.

Fine
5
Poor
14
2007-1-23 14:03:46 By Chandranath Dutta
Dear Sir,
In PET injection molding, rate of Injection around 10 to 12gms/sec
is maintained. It is the hold time and cooling time that contribute to cycle time. So how these parameters are decided in relation to Wall thickness of Preform being processed.Also how best the transition position is decided so that hold becomes effective.


Thanking you very much,

yours truly,

Vijay

Fine
12
Poor
2007-1-22 16:19:27 By Vijay
1
 
 

Post A Reply

Temporarily shut down, no new message, sorry.

Name:

Email:



Message:

(Max. 2KB)





Attachment:     (Max. 500kB, .RAR.ZIP.JPG.GIF only)
Verification:

This forum published since July 03, 2002. Renewed on June 22, 2005.

[Plastics Project] [Plastics Machinery] [Plastics Mold] [Discussion Forum] [Contact Kenplas]
Copyright © 2025 Kenplas Industry Limited, Hangzhou Kenplas Machinery Ltd.              Powered by Alentus.