|
Kenplas Forum ==> Blow Molding (Machine) ==> trouble shooting tips for injection blowmolding process
|
|
|
1 |
Regarding Uneven Wall - CHECK -
* Equal Distribution of Material
* Right conditioning of Preform before Blowing
* Min. wall thickness is ok (By cutting Bottle Produced)
* Blowing pressure & Time
* Chiller Temp.
Regarding Transperency at Bottom - CHECK -
* Bottom Zone Temp should not be Too High
* Pre Blow Delay / Blow Delay time is NOT GIVEN OR GIVEN LESS
* OUT COLD time NOT Given Or is LESS OR Position is NOT Right
* Hot Manifold temp. i.e Z1 is Very High
* Not enough Slug in Preform
* Refilling RPM is too high
|
we are facing bottom transperence and wall thckness varition in injection blow molding process . can any help me in this and if u have any material on trouble shooting plz kindly send me to cnu_2804@yahoo.co.in
|
1 |
|
|
|
This forum published since July 03, 2002.
Renewed on June 22, 2005. |