Visitor No.2939092 ..   
TrustPassKenplas Industry Ltd.Discussion Forum
 
Kenplas Forum ==> Injection Molding (Machine) ==> Pet preform curing process
<< Previous Topic Next Topic >>
1
Yes ! I wont call it curing, more like moisture absorbing.
Preforms need to absorb a specific amount of moisture to give a smooth blowing process. 2 -3 days are minimum.

Fine
2
Poor
2011-10-27 12:46:19 By tajdar khan
I would like to know if it is necessary for PET preforms to cure before using them especially carbonated containers??

Fine
5
Poor
2011-8-19 14:39:35 By Francois Squire
1
 
 

Post A Reply

Temporarily shut down, no new message, sorry.

Name:

Email:



Message:

(Max. 2KB)





Attachment:     (Max. 500kB, .RAR.ZIP.JPG.GIF only)
Verification:

This forum published since July 03, 2002. Renewed on June 22, 2005.

[Plastics Project] [Plastics Machinery] [Plastics Mold] [Discussion Forum] [Contact Kenplas]
Copyright © 2025 Kenplas Industry Limited, Hangzhou Kenplas Machinery Ltd.              Powered by Alentus.